house connections + kindling
are planned, this morning the civil contractors and Gas and electrical installation group from the e-werk Reinbek opened the supply lines to put into the house. Will work out very well thus far.
was first down the gas line into the house, power came somewhat later, the poor civil contractors were allowed aufbuddeln namely the "half street". Problem is that the main supply lines were planned and installed as "locust" was still in the planning phase. Therefore have then moved some road boundaries and partly the main artery now 1-2 meters below the land our future neighbors. Well not so bad, the guys were still the same has a solution and said the same as recorded on the edge of the road and everything ready to move to the Stomleitung. In fact, are then late afternoon once again the Srommonteure (E-Werk) came out to join the lines so far. To all parties hereby again a big thank you. Although their job, but these have all performed very well, was part of the electrical company is "zero point zero" problems:) was
Well, the second surprise, that our plumbing company (Schubert) already in the house was and heating as well as the condensing boiler installed, so have the heating system was put into operation.
So, until here it all Great, now the problem (!!!), our electrician again get an appointment (I say nothing at this point, unless I've cooked quite internally, further details please ask at Anne ...).
So I have summarily called directly from Mr. Brand (electronic) (compared to 15 clock) and He explained the problem. Not that we supply our heating with electricity via a cable, which is located on a busy road, and right ends in our Baustromkasten. What happens there could be so in our absence, I will not even imagine. Well
result is now that we have none. How and when is now, the connection between house connections and the fuse box is in the stars ... I only say SITE MANAGER * grrrr *