drying, filling, drying

Well I'd say the title says it all . For days now we go regularly to the site and happy to break the windows. Otherwise, it dries very well, the only wet spots in the plaster are those where massive concrete (falls) is behind. But even these dry places, slowly, but dry:) The floor is also brighter by the day, which was also good.

is Otherwise I noticed yesterday something not so nice, we bought eigtl a heating preparation in the loft, it had but I look after several not found, am curious what our construction management says, especially from is tiled 05:01:09 and we at 09.01 - will 11:01:09 underline final. Then tear open walls, etc. not the best, well, we can surprise us sometimes, fact is: The lines have since remained high, however.

Otherwise, we were at the weekend and have diligently with strong support (big thanks to the "Ronny" helpers) all smoothed and polished. I will again tonight, the concrete slab so that we grind these primed after Christmas can. Otherwise, if dry, primed the walls and then still under repair. We chose not to bring murals on the wall, then is the real Sch **** repair work:) Well if the primer is all over it come to the EC nor the plaster strips glued together and also need to be primed. All in all a great deal, let's hope we are up to 09.01. finished, for the weekend so as mentioned, the final painting on the wall .....

So at this point we wish all readers and friends a beautiful and peaceful Christmas 2008th Enjoy the days and let you bestow rich ...

Greetings ...... Anne-Catherine and Mario

(PS: before New Year we will get more time, I promise ;-))

Wednesday, December 17, 2008

Dragon Ballbulma Doujin

& Dry III

Today there was again a surprise. Anne was once again to air in Neuschö (yes I lie in bed sick * sniff *) and lo and behold, our dry-farm (from Boye) stations were busy as a bee. In addition to the catwalk in the loft, the fitters have installed the floor stairs slot. On this weekend we can then use for the first time:) Looking forward to it ... Pictures are then later ... Otherwise
dries the construction now happily to herself, the beautiful is that it probably should be warm ... Will I be me tomorrow night after work sometimes convince myself. :) Joa
this coming weekend is then measured walls (to determine total square meters), so we can prepare materials. After Christmas, it starts then, priming, painters, decorating and .... ventilate;)
have still got some data from our construction manager as it comes to an end: p
From 05:01:09 to 15:01:09, the tile (from Bastian) because, at 23.01. is our staircase and at 27.01. again comes from Hansen and installed the interior doors and adjusted the utility room and main entrance door. In between, it is likely that the electricians and the sanitary engineers for final assembly.
That means for us, to 27.01. the house must be quasi-Ready - I am looking forward to work after work:) So then
until the next entry ... Until the have a nice 3rd of Advent.

PS: Almost forgot, at 15.01. the kitchen is looking forward happy * *

Tuesday, December 16, 2008

Deborah Sampson's Famous Quotes

Electricians + Telekom

JAAAAAAAAAAAA - 1,000,000 x thanks Bernd fire. But this morning was actually at 7:00 clock in our house and has all solid, so we now have electricity in the house. Well, it all can not be done, etc. But he has again despite tight schedule made everything possible. We are very happy:) Well
and incidentally today was also a very nice mechanic Telekom there and yes, yes, we have a working phone line in the house. I will not do that commercial, but as the Telekom manage it, amazes me still current. From application to today's connected, everything transparent, quick and easy. It condensed the characters that we might soon again will be telecom customers:) Very great service ...

Sun now have no desire to write:) Please look at the photos out, there are a few small impressions. Tomorrow will follow once a view of the next 3-4 weeks in which it is now going quite steep ... Sore muscles, we come :))))

Monday, December 15, 2008

Pos Systems For Yogurt Shops

house connections + kindling

are planned, this morning the civil contractors and Gas and electrical installation group from the e-werk Reinbek opened the supply lines to put into the house. Will work out very well thus far.
was first down the gas line into the house, power came somewhat later, the poor civil contractors were allowed aufbuddeln namely the "half street". Problem is that the main supply lines were planned and installed as "locust" was still in the planning phase. Therefore have then moved some road boundaries and partly the main artery now 1-2 meters below the land our future neighbors. Well not so bad, the guys were still the same has a solution and said the same as recorded on the edge of the road and everything ready to move to the Stomleitung. In fact, are then late afternoon once again the Srommonteure (E-Werk) came out to join the lines so far. To all parties hereby again a big thank you. Although their job, but these have all performed very well, was part of the electrical company is "zero point zero" problems:) was

Well, the second surprise, that our plumbing company (Schubert) already in the house was and heating as well as the condensing boiler installed, so have the heating system was put into operation.

So, until here it all Great, now the problem (!!!), our electrician again get an appointment (I say nothing at this point, unless I've cooked quite internally, further details please ask at Anne ...).
So I have summarily called directly from Mr. Brand (electronic) (compared to 15 clock) and He explained the problem. Not that we supply our heating with electricity via a cable, which is located on a busy road, and right ends in our Baustromkasten. What happens there could be so in our absence, I will not even imagine. Well

result is now that we have none. How and when is now, the connection between house connections and the fuse box is in the stars ... I only say SITE MANAGER * grrrr *

Tuesday, December 9, 2008

Swollen And Mottled Ankles

screed

Today, as planned, the screed has been poured. As always, everything was fixed and the site was then 1A again tidy and clean. Real amazing that it works so well:)

Well may we not clean, only a quick snapshot, of course I could not resist me, will you 10sec. to suckers in the door: P

Monday, December 8, 2008

How Long Should I Stay On Cipralex?

Blower Door Test

Hello dear readers, today even a few more entries ... Unfortunately, it was the last day but very stressful at the house is a lot happening, and incidentally we carry now for almost a week of a flu infection around with us, both of us finally paralyzed.
to return home.
on Monday (. 08.12) was unexpected visit, "the Blower Door Test" to stand. Thought comes a week later, but no matter if it is already there, he may stay too:) It was really interesting time to witness the live and the result is impressive. We are well below the critical value, which means that the trades have worked well. The house is tight! :) Oh yes, the whole look in "Live" from:

Sunday, December 7, 2008

Blue Ice Rub For Horses Legs

Photos II

we were so to Nicholas again at the house and have the work held the last 2-3 days - as always, photos and shell Interior:)




is (even more beautiful when it is completely dry:))

Thursday, December 4, 2008

Small Format Inkjet Uv Printers

Photos & News

So, the last days was a bit stressful ...

... first of all to the photos. There are under shell and core a few new photos. Unfortunately I would need for inside a camera with wide angle, but I hope you can also see something like that:) Here's the current status:


What else happened ...

... the scaffolding is gone, the cleaning crew was there and date are the plumbing experts at work will probably be ready for tomorrow. Again, we can find no serious deficiencies, on the contrary, all work very carefully and leave the site clean.
Next Tuesday (. 09.12) then the screed comes into the house first and then be 4-5 days off:) Say no must look ... Oh yes in the next week there is the sewage connection, our cistern (5.ooo liter) and our drainage system. Thus, the flow of water is also regulated.
Am 15.11. Then gas and electricity to the house and if all goes well is being fueled on the 16th. Would be great for Christmas then we have electricity and heat in the house:) A big dream ... we hope it works out ...

PS: This weekend we will make photos of the geputzen walls, and plumbing and heating pipes ... to denne