Six months ago, was the first day of the house inventory. Exactly three months later the house was ready for collection. Now it's like to take the time to be with all who have contributed to the success of this project:
financial advice: economy mbH
Financing: apoBank Dortmund branch
Investor: finger house GmbH
Surveying: Census Bureau Wilhlem Hofmann
Townhouses / Excavation: Helfri Construction Company Ltd.
geothermal drilling: Geo-Drilling GmbH & Co. KG
Heizungs-/Solaranlage: Viessmann Werke GmbH & Co KG
Power: E. ON Mitte AG subsidiary Marburg
water supply: Stadtwerke Marburg
heating engineers: Rimu GmbH
Electrical systems: Hans Schilling Elektro GmbH, Burgwald
screed: Schwender GmbH
external plaster: Gerd Linne Baudekoration, weather
tilers: brown tiles and Keramikbau GmbH
window: Carpenter Münkel
carport roofs: Realty Herbst GmbH
bathroom extension: Anton Mössinger GmbH , from HPW
Moving: stain Buhler
garden design: Green Team Dommelmühle
telephone: This was supposed to be the telecom, which has apparently not made from inability to date to create the service entrance.
Internet: Stadtwerke Marburg , via WiMAX
Tuesday, September 21, 2010
Sunday, September 19, 2010
Headache Crest White Strips
lawn
Sun meanwhile have already gone back a few weeks into the country. The grass is already grown well and the new mower is already the first applications behind. In the meantime, even the firewood for the winter arrived and the stove has been the first test runs behind. Although the last days and nights so pretty already cool were I needed the heater up to now not be required that provide large windows for the south still comfortable 22-24 ° C in the living room.
Sun meanwhile have already gone back a few weeks into the country. The grass is already grown well and the new mower is already the first applications behind. In the meantime, even the firewood for the winter arrived and the stove has been the first test runs behind. Although the last days and nights so pretty already cool were I needed the heater up to now not be required that provide large windows for the south still comfortable 22-24 ° C in the living room.
Subscribe to:
Posts (Atom)