Tuesday, December 23, 2008

How Long Did The Acreus Event Last In Soul Silver

drying, filling, drying

Well I'd say the title says it all . For days now we go regularly to the site and happy to break the windows. Otherwise, it dries very well, the only wet spots in the plaster are those where massive concrete (falls) is behind. But even these dry places, slowly, but dry:) The floor is also brighter by the day, which was also good.

is Otherwise I noticed yesterday something not so nice, we bought eigtl a heating preparation in the loft, it had but I look after several not found, am curious what our construction management says, especially from is tiled 05:01:09 and we at 09.01 - will 11:01:09 underline final. Then tear open walls, etc. not the best, well, we can surprise us sometimes, fact is: The lines have since remained high, however.

Otherwise, we were at the weekend and have diligently with strong support (big thanks to the "Ronny" helpers) all smoothed and polished. I will again tonight, the concrete slab so that we grind these primed after Christmas can. Otherwise, if dry, primed the walls and then still under repair. We chose not to bring murals on the wall, then is the real Sch **** repair work:) Well if the primer is all over it come to the EC nor the plaster strips glued together and also need to be primed. All in all a great deal, let's hope we are up to 09.01. finished, for the weekend so as mentioned, the final painting on the wall .....

So at this point we wish all readers and friends a beautiful and peaceful Christmas 2008th Enjoy the days and let you bestow rich ...

Greetings ...... Anne-Catherine and Mario

(PS: before New Year we will get more time, I promise ;-))

0 comments:

Post a Comment