& Dry III
Today there was again a surprise. Anne was once again to air in Neuschö (yes I lie in bed sick * sniff *) and lo and behold, our dry-farm (from Boye) stations were busy as a bee. In addition to the catwalk in the loft, the fitters have installed the floor stairs slot. On this weekend we can then use for the first time:) Looking forward to it ... Pictures are then later ... Otherwise
dries the construction now happily to herself, the beautiful is that it probably should be warm ... Will I be me tomorrow night after work sometimes convince myself. :) Joa
this coming weekend is then measured walls (to determine total square meters), so we can prepare materials. After Christmas, it starts then, priming, painters, decorating and .... ventilate;)
have still got some data from our construction manager as it comes to an end: p
From 05:01:09 to 15:01:09, the tile (from Bastian) because, at 23.01. is our staircase and at 27.01. again comes from Hansen and installed the interior doors and adjusted the utility room and main entrance door. In between, it is likely that the electricians and the sanitary engineers for final assembly.
That means for us, to 27.01. the house must be quasi-Ready - I am looking forward to work after work:) So then
until the next entry ... Until the have a nice 3rd of Advent.
PS: Almost forgot, at 15.01. the kitchen is looking forward happy * *
0 comments:
Post a Comment