drywall I
Thus, the dry-farmer has managed in the meantime also to us. The insulation is installed, vapor barrier film and also Unterkonstruktin (photos interior design, new link).
Looks as far as we can tell, all very good. Now I only have the walls above are completed, then an electrician and Santärgewerke come in, and if the lines are coming all the drywall out again to dress. Should all so in week 46/47 to happen because in week 47 probably the cleaner (polish) to come. Well, we can surprise us. Mid-week 46 should be by our masons, then fixed to the window clean, then the E-turn work Reinbek, with gas and electric supply line. Then, as already written and electric Sanitärvorinstallationen and then the plaster is already on the wall. The bottom line is that a "stormy" November - only hope it all goes as is planned. According to construction schedule, we are essentially on schedule.