After we signed the planning documents of FH was sent on 26.10.2010, the first version of the preliminary moves, which were not all changes included. The windows version had been modified so are also included.
The changes we announced telephone, marked on the Vorabzugsplänen and sent to FH.
have meantime, we get the confirmation of funding and so we could eliminate the rights of withdrawal. On 11/02/2010
came the confirmation that the Liefertirmin of the house on September Move 2011. (The contract for the 2nd quarter was denied 2011)
On 10/11/2010, the second of deductions come with any changes. (As of 11/10/2010)