Update on the Construction (borehole, screed drying, skylights)
So, after a long time again a sign of life. The house is finished and the body shop is equipped with heating, plumbing and Elektrointallation. Large margins Visitors were not provided and the schedule has been followed until now.
was gratifying that the borehole is managed without additional hammer drilling, which has saved us additional costs. Instead of the expected rock (soil class 6), it was just sound and weathered rock, which was processed with the normal Spülbohverfahren. According to drilling company insgesmat 4.5 m3 drilling water were consumed. Drill cuttings (clay) was collected in a container, this is certainly better than the cuttings in a tray to collect on the property because it is one tough nut to crack.
The screed was introduced, but unfortunately, the heater worked and could only be started with a delay, after which I phoned and asked to have the Viessmann did send over a technician. The technician was very fit and had the error found: 1 The three heaters were not turned on and 2 The pump would not work because too much air was in the heating circuits. Now running the heater, and it is better not to look at the meter (in 7 days 465 kWh). Good that it is at least current with a heat pump gündtigeren tariff. Another tip from the technician: Unfortunately, the description of the heat pump was not on site, this should always be at the plant, as the technician this required. So daruaf care that make the Heizungsintallateure the manual site. Another Council was that the system of Z16A backups should be protected. We
an insulated roof windows had sampled. Unfortunately, first a normal 4-socket window was installed. Angry because I had pointed out extra to have some more time to plan the scheduled window. It was now a window of LempHirz (WRA 1.6) ordered that but that does not fit in the place (too big). Let's see where we end up at the end.
0 comments:
Post a Comment