seal bottom plate / wall
Here is a slightly longer report because this issue but are now already busy for a while. Caveat: As part of the planning discussion was no discussion of the open space design. Rather, the protocol was a cross that the relevant documents were not handed over. As part building permits has given us the open space plan, and we have entered there, our desires: Terrace in the south and the north and the west side of the house. The terrace will be here as close to the house limit. The paving of the house entrance and driveway to the garage adjacent to the house.
In the application documents, this has been implemented for us and apparently located. Here is advisable to look more closely at what we were not able to do. Around the house a gravel bed has been scheduled by 40cm wide. The paving of the terrace and had accordingly always this distance from the house. An active release of finger-house, that such a gravel strip is necessary (why will come later) was compared to we are not expressed.
As part of the sampling was unfortunately not to elaborate on this question. It was recommended that only one of the times to look at model homes and pay attention to the inputs with and without step. That was all on the subject in the sample.
was not until some time later, we demand to two working standards (17.07 and 12.07) sent to show the entrance and terrace access. This we should return and sign.
With the implementation plans and after a few phone calls and emails was clear to us what exactly is the significance of the work standards and the information is here, in our view the customer more than confused.
So: If you want to actually move the terrace at the house and the paving adjacent to the house must leave the base plate are specially sealed (this costs a hefty additional price per meter). If the intention is a tiling even directly comes in the door again to a surcharge for special doors. If you're unlucky and the spacing of the paving to the front wall is less than 15cm must also be sealed off the wall special. All of this results from the DIN18-195-Table 4.
is otherwise the gravel strip around the house needed to keep the soil moisture does not attack the house work. Accordingly, it is important for the guarantee to adhere to these principles.
Now It would be really easy to talk about this in the context of the conversation or planning to issue, in the sample. All the more so since the company standards are not easily comprehensible to the layman. In some, the base with a bitumen membrane sealed on the sides (no gravel) to another is referred to the DIN standard times then not again ....
has unfortunately been ironed our criticism of finger-house in this direction: According to finger-house is the planning of the outdoor facilities not up to finger-house, we signed the building permits and the two working standards so that's all confirmed and otherwise, can all be discussed with the supervisor.
This was for us a lesson in how to frighten off customers and provides poor service.
0 comments:
Post a Comment